5 Oganization
Participants, Roles and Responsibilities
1.1 Enterprise 1.1.1 Organizing Model 1.1.2 A Framework for Organization Design 1.1.3 Real Estate Function 1.2 Decision Makers 1.2.1 Private-Sector Owners 1.2.2 Developer / Investment Owners 1.2.3 Public-Sector Owners 1.2.4 Executive Management and Project Sponsors 1.2.5 Owner’s Project Manager 1.3 Stakeholders 1.3.1 Owners, Executives, and Sponsors 1.3.2 End Users and Cross-Functional Enterprise Departments 1.3.3 Service Providers and Advisors 1.3.4 Strategic Planners 1.3.5 Real Estate Advisers 1.3.6 Architectural Programmers and Workplace Consultants 1.3.7 Project Managers, Including Appointed OPMs 1.3.8 IT Project Managers 1.3.9 External and Public Stakeholders | 1.4 Roles and Responsibilities 1.4.1 Leadership Responsibilities and Partners 1.4.2 RAPID Matrix 1.4.3 Phase Gates 1.5 Change Management 1.5.1 Application to the Strategic Predesign Process 1.5.2 Change Management Communication Plan 1.5.3 Putting the Plan into Practice 1.6 Process Improvement 1.6.1 Application to the Real Estate Function 1.6.2 Application to Strategic Predesign 1.6.3 Developing the Internal Delivery Team 1.6.4 Cross-Functional Delivery Team |
Introduction Strategic predesign connects enterprise strategy to the requirements for physical assets and capital projects before design begins. This chapter explains how organizational design, governance, phase leadership, and stakeholder participation support that work. It begins with enterprise organization and owner authority, then defines stakeholder and service-provider roles, decision responsibilities, and phase gates. The three predesign phases—Strategic Planning, Real Estate, and Project Definition—establish the direction and approved requirements that guide subsequent design, construction, and operations. The chapter then addresses change management and process improvement: engaging stakeholders, communicating decisions, refining workflows, and developing internal delivery teams while projects progress. Cross-functional coordination, mentoring, and documented playbooks help retain practical knowledge for future work. Together, these practices connect clear authority and requirements with the people and processes needed to carry them into successful delivery and operations. 1.1 EnterpriseAn enterprise is a business, organization, institution, or government agency considered as a coordinated whole. In this chapter, the term refers primarily to organizations whose capital planning involves multiple operating units, functions, or locations. These enterprises commonly exhibit the following traits, although size and hierarchy alone do not define an enterprise:
1.1.1 Organizing ModelStrategic predesign works best when strategy, structure, processes, rewards, and people reinforce one another. These five organizational design dimensions follow Jay Galbraith’s Star Model. Aligning them can reduce friction, conflicting priorities, delays, and value leakage while supporting strategy execution. 1. StrategyStrategy defines the organization’s direction: its vision, mission, goals, objectives, and sources of competitive advantage or public value. In strategic predesign, it establishes the criteria for evaluating alternatives and making trade-offs across the remaining organizational design dimensions. 2. StructureStructure is the formal placement of power and authority within the organization. It involves the following features:
3. ProcessesProcesses govern work, information flow, and decision-making across the organization. They operate in two directions:
Structure defines reporting lines, hierarchies, functional departments, and formal divisions of labor. Processes connect these arrangements through workflows, decision channels, information exchanges, and cross-functional interaction. As work becomes more uncertain or complex, reporting lines alone may not provide enough coordination. Leaders must also align lateral relationships, goal setting, and information systems so the organization can adapt and execute effectively. 4. RewardsRewards include performance measures, compensation, recognition, and incentives. They align individual goals and motivations with the organization’s strategic direction. Misaligned rewards can undermine operating-model changes by encouraging behavior that conflicts with the intended outcomes. 5. PeopleHuman resource policies address recruitment, selection, rotation, training, and career development. Together, they develop the mindsets, skills, and organizational capabilities needed to execute the strategy. 1.1.2 A Framework for Organization Design Enterprises vary in form and purpose, and their organizational arrangements change as they respond to competitive pressures and other external forces. During Strategic Planning, the strategic planner identifies the capabilities the enterprise needs to achieve its mission. The framework below makes that connection explicit: strategy defines the required capabilities, while structure, processes, people, and rewards enable them. Capabilities link strategic intent to organizational choices; they are not a replacement for strategy in Galbraith’s five-category Star Model. Aligning and realigning these choices supports competitive advantage or, for mission-driven organizations, effective mission delivery. 1.1.3 Real Estate Function The same framework applies to the real estate function across Strategy and Planning, Design and Construction, and Facility Operations. A real estate director uses the Star Model’s five categories to align this function with enterprise strategy. The following descriptions explain how required capabilities connect that strategy to structure, processes, people, and rewards. Capabilities are the organizational abilities needed to execute the strategy. They identify what the enterprise must do well to differentiate itself in its competitive environment or fulfill its mission, and they help define the critical success factors against which organizational choices are evaluated. Structure determines where formal power and authority reside. Organizational units are typically grouped by function, geography, customer, or product. These arrangements establish reporting relationships, decision authority, and formal communication channels. Processes are connected activities that move work and information vertically and horizontally through the organization. Work processes and management processes define the roles and responsibilities needed to perform activities, identify when work can be completed within one unit, and establish when collaboration is required. People policies guide employee selection, staffing, training, and development, including communication between employees and managers. These policies develop the skills and capabilities managers and employees need to work effectively. They are shaped by the organization’s shared culture: the values, mindsets, and norms of behavior that develop over time. Rewards align individual behavior and performance with the organization’s mission. They include compensation, recognition, and incentives, supported by metrics used to evaluate individual and collective performance. Measures indicate progress; rewards reinforce the behavior needed to achieve it. 1.2 Decision Makers 1.2.1 Private-Sector OwnersPrivate-sector owners hold ownership interests in an enterprise. Their economic and governance powers depend on its legal structure and governing documents; an ownership interest does not necessarily confer day-to-day management authority. Common forms of ownership include. Shareholders / Stockholders: In publicly or privately held corporations, shareholders hold equity shares. Their economic and voting rights depend on the number and class of shares held and the corporation’s governing documents. Partners: In partnerships, such as law firms, architectural practices, or consulting firms, partners hold ownership interests. Their rights to profits, responsibility for losses, management authority, and personal liability depend on the partnership structure, governing agreement, and applicable law; general and limited partners do not necessarily share the same responsibilities. Sole Proprietors: In smaller enterprises, a single individual owns and operates the business entirely, holding 100% of financial and legal responsibility. Members: In Limited Liability Companies (LLCs), the owners are referred to as members. Founders & Private Equity / Venture Capital Firms: In growing commercial enterprises or startups, early founders and institutional investors who hold equity are key owners guiding strategic direction. Key Responsibilities and Rights of Enterprise Owners:
1.2.2 Developer / Investment Owners Developer and investment owners are private-sector entities, commercial developers, institutional investors, or corporate entities that commission, finance, construct, and operate real estate assets and infrastructure to generate financial returns, maximize capital appreciation, or satisfy specific corporate portfolio strategies. Unlike public-sector entities driven by public service mandates, developer and investment owners prioritize bottom-line financial performance, return on investment (ROI), internal rate of return (IRR), net operating income (NOI), and property asset valuation. Projects are evaluated through a lens of market risk, leasing velocity, construction cost volatility, debt financing costs, and exit strategies (e.g., disposition, recapitalization, or long-term hold). Projects are funded through complex private capital structures involving equity partners, institutional lenders, construction loans, mezzanine debt, and occasionally public-private incentives or tax credits. Time is directly tied to capital cost; minimizing the predesign, entitlement, and construction timeline is paramount to reducing carrying costs and capturing market demand windows. How Developer / Investment Owners Operate in Strategic Predesign
1.2.3 Public-Sector OwnersPublic-sector owners are government entities, public agencies, or publicly constituted institutions that commission, finance, or operate public assets and infrastructure, such as schools, civic buildings, transit systems, military installations, and utilities. They pursue public-service mandates within statutory governance, funding, and accountability requirements. Private-sector objectives vary and may include financial returns, operational effectiveness, or institutional missions. Public-sector owners are accountable to the public through their governing institutions and applicable oversight processes. Decisions may be subject to public scrutiny, records-disclosure requirements, and hearings, with applicable exceptions; citizens and taxpayers are not corporate shareholders. Instead of maximizing profit margins, public-sector owners prioritize public health, safety, community equity, long-term civic utility, and regulatory compliance. Projects are typically financed via public funds, municipal bonds, tax revenues, or federal/state grants. Budgets are tied to rigid fiscal year cycles and statutory approval processes, requiring high levels of financial transparency. They must navigate extensive bureaucratic, environmental, zoning, and statutory procurement mandates that dictate how projects are budgeted, bid on, and executed. How Public Sector Owners Operate in Strategic Predesign
1.2.4 Executive Management and Project SponsorsExecutive management and project sponsorship often overlap in major initiatives, but they carry distinct authorities, accountabilities, and perspectives. The same person may hold both roles; the project charter must distinguish enterprise authority from initiative-specific responsibilities.
The Owner's Role Sets the Boundaries: Owners establish the risk appetite and overall financial thresholds. In a real estate or capital project, they define how much capital can be deployed across the enterprise portfolio and what long-term strategic goals must be met.
1.2.5 Owner’s Project ManagerAn Owner’s Project Manager (OPM) is a professional or firm engaged by the owner to provide project-management advice and representation within an agreed scope. The term Owner’s Representative is often used for a similar owner-side role, but the titles are not necessarily interchangeable. Services may span planning, design, construction, and closeout; authority, agency status, and any fiduciary obligations depend on the appointment, contract, and applicable law. An OPM supplements the owner’s internal capacity and specialized expertise during capital planning and delivery. Within the agreed mandate, the OPM coordinates the baseline established during Project Definition, monitors costs and schedules, reviews proposed changes, and reports deviations for resolution. Procurement support may include preparing RFQs or RFPs where applicable, evaluating submissions, and supporting contract negotiations with Procurement and Legal. The OPM coordinates early review of site constraints, permitting, and constructability risks and facilitates communication among Real Estate, Finance, Legal, IT, HR, and external delivery partners. These services do not confer signature authority, replace specialist professional duties, or guarantee project outcomes. Why Enterprises and Public Owners Use OPMs:
1.3 StakeholdersStakeholders are individuals, groups, or organizational units that can affect, be affected by, or perceive themselves to be affected by project decisions and outcomes. Strategic predesign connects enterprise business strategy with physical-space delivery, so participation extends beyond the project team to internal leadership, cross-functional departments, external partners, and communities. The following sections distinguish these groups and their contributions. 1.3.1 Owners, Executives, and SponsorsOwners and Governing Boards: Exercise ownership and governance rights under the applicable legal structure; establish or approve capital limits, strategic direction, and risk tolerance through designated authorities. Board duties and owner rights are distinct and depend on governing documents and applicable law. Executive Management (C-Suite & Managing Partners): Translate the owner's vision into operational directives, establish cross-functional governance frameworks (such as steering committees), and oversee portfolio performance. Project Sponsors: Act as the business-unit champions or internal owners of a specific initiative (e.g., HQ relocation or hybrid workplace transition), securing project funding and driving internal alignment. 1.3.2 End Users and Cross-Functional Enterprise DepartmentsBusiness or Administrative Units: These are the primary operations of the enterprise that have the responsibility for the delivery of goods and services to customers and constituents. Real Estate, Design and Construction, and Facilities and Workplace Operations: These functions manage portfolio assets, lease negotiations, and site selection; oversee design and construction projects; and operate facilities and associated services. Depending on the enterprise, services may include office support, safety and security, travel, janitorial work, mailroom operations, shipping and receiving, reception and visitor processing, food and beverage, venue management, and maintenance. Human Resources (HR): Champions organizational culture, employee experience, headcount forecasting, and change management. Information Technology (IT): Defines digital infrastructure, AV systems, smart-building technology, and data security requirements. Finance / Accounting / Treasury: Manages business case modeling, ROI analysis, cash flow projections, and budget controls. Legal & Procurement: Navigates regulatory compliance, contract negotiations, vendor agreements, and risk mitigation. Communications: Responsible for internal (employee) and external (public) messaging and communications. Stakeholder engagement begins in Strategic Planning and continues through Real Estate and Project Definition. RAPID (Recommend, Agree, Perform, Input, Decide) clarifies roles for significant decisions; it complements, rather than replaces, task assignments and an engagement plan. Early cross-functional participation helps expose conflicting requirements and reduce misaligned expectations, scope creep, and downstream changes. 1.3.3 Service Providers and AdvisorsService providers and advisers contribute specialized expertise across strategic predesign and the built-environment lifecycle. Their work often overlaps, but coordination does not make their contractual duties interchangeable. This overview identifies the disciplines; the following subsections explain the planning, real estate, programming, project-management, and technology roles in more detail. Owner’s Project Managers (OPMs) / Owner’s Representatives: Owner-side advisers who manage master schedules and budgets and coordinate the delivery team within a defined appointment. Independence, decision authority, and any fiduciary duties depend on the contract and applicable law. Design & Architecture Teams: Translate the Program of Requirements into spatial, functional, and aesthetic designs (planners, architects, interior designers, and specialized consultants). Engineering & Technical Consultants: Provide structural, MEP (mechanical, electrical, plumbing), civil, and acoustic expertise to ensure technical feasibility. Real Estate Brokers & Transactional Advisers: Conduct market surveys, source pre-qualified properties, and lead lease negotiations. Contractors and Construction Managers: Contractors execute construction and manage site activities within their contracts. A construction manager may provide owner-side advisory services or undertake construction delivery responsibilities, depending on the delivery model and appointment; not every construction manager performs the physical buildout. Facilities and Workplace Operations: Outsourced management and maintenance of facilities, facility operations and employee services. 1.3.4 Strategic PlannersStrategic planners align the enterprise’s long-term business goals, vision, and growth trajectory with portfolio-wide physical and organizational strategies. They establish the planning basis for location decisions and project requirements. Primary Responsibilities:
1.3.5 Real Estate AdvisersReal estate advisers source and evaluate physical assets that match the enterprise’s operational and financial parameters. They support transactions and negotiations within their authorized scope, working with the portfolio team, Legal, and Finance. Primary Responsibilities:
1.3.6 Architectural Programmers and Workplace ConsultantsArchitectural programmers and workplace consultants translate qualitative information about organizational culture and quantitative business-unit needs into a data-informed Program of Requirements (POR). The POR defines what the project must achieve and provides the basis for subsequent design. Primary Responsibilities:
1.3.7 Project Managers, Including Appointed OPMsProject managers coordinate Project Definition and execute the approved delivery plan by managing scope, schedule, budget, and cross-functional coordination. An appointed OPM performs the owner-side services assigned by contract; the appointment determines the role’s scope and authority. Primary Responsibilities:
1.3.8 IT Project ManagersThe IT Project Manager coordinates the project’s technology scope, budget, schedule, and operational readiness with the overall Project Manager. The role connects facility requirements with secure, maintainable technology systems for new facilities, renovations, and relocations, including hybrid work, data protection, and operational workflows. Primary Responsibilities:
1.3.9 External and Public StakeholdersRegulatory Bodies: Municipalities, planning commissions, and government agencies that enforce zoning laws, building codes, environmental regulations, and public safety standards. The Community & Public Users: Citizens, local neighborhoods, or client bases who interact with the asset, particularly in public-sector or civic projects where transparency and public trust are paramount. 1.4 Roles and Responsibilities1.4.1 Leadership Responsibilities and PartnersThe following table consolidates the roles described above and shows their principal responsibilities and partners across strategic predesign and subsequent delivery. Strategic planners lead strategic evaluation; portfolio and asset managers lead real estate work; and project managers coordinate Project Definition and delivery. These are phase-leadership assignments, not automatic approval rights. Contractual duties and decision authority remain governed by approved appointments and delegations.
1.4.2 RAPID MatrixThis proposed matrix applies Bain & Company’s RAPID decision-role framework to Strategic Planning, Real Estate, and Project Definition. It links working outputs to decisions about their acceptance or authorization. RAPID assigns decision roles; it is not a task-responsibility matrix or a sequence of steps. Role abbreviations and authority. SP = Strategic Planner; PAM = Portfolio and Asset Manager; PM = Project Manager, including an appointed OPM only within its mandate; Sponsor = Project Sponsor; EM = Executive Management, including the corporate real estate (CRE) executive as applicable; Owner = designated owner, board, or public-sector authority; SC = Steering Committee. A phase leader’s D covers acceptance of working outputs within approved scope, not capital commitments, contracts, or reserved owner decisions. D* marks an authority that has not yet been designated: assign the Sponsor where delegation permits, otherwise the authorized EM or Owner decision maker. Where a collective body decides, record its governing decision rule. Before using any row, confirm the named R and D, each mandatory A requirement, approval thresholds, signature limits, and escalation route. If separate decisions require different authorities, record them separately rather than assigning multiple Ds to one decision. Stakeholder abbreviations. BU/users = business or administrative unit leaders and end users; BU leaders = those unit leaders. FIN = Finance, Accounting, and Treasury, including FP&A. HR/COM = HR, Communications, and workplace/change-management leads as relevant. IT = IT department; IT PM = IT Project Manager. OPS = facilities and workplace operations, safety/security, and relevant outsourced providers. RE advisers = brokers and transaction advisers. Technical specialists include architecture, engineering, environmental, survey, and valuation advisers as required. Programming = architectural programmers and workplace consultants. Data owners and the Information Manager have task-specific information responsibilities. Regulators and community/public users provide input where applicable; statutory determinations remain separate from internal RAPID authority. Contractors and construction managers provide predesign feasibility, estimating, scheduling, and delivery input only when engaged. This matrix does not authorize construction execution. Phase 1.1 — Strategic Planning
Phase 1.2 — Real Estate
Phase 1.3 — Project Definition
1.4.3 Phase GatesPhase 1.1 gate record: approved planning direction and next-phase work, including conditions, unresolved issues, financial assumptions, and any higher-level authorization required. Phase 1.2 gate record: approved real estate direction, criteria and evaluation evidence, due-diligence findings, separately authorized property commitments, unresolved conditions, and the baseline transferred to the Project Manager. Phase 1.3 gate records comprise: (1) the Approved Plan; (2) the owner-approved POR, including traceable requirements, success criteria, and reconciled scope, quality, budget, schedule, technology, and risk baselines; (3) Project Readiness Review findings and the updated business case; and (4) the recorded owner decision to proceed, proceed with conditions, defer, or decline. The readiness review establishes the evidence for a decision; it does not itself authorize the next phase. Record each condition, responsible party, and applicable delegation with the owner’s decision. 1.5 Change Management Change management is a structured approach to helping individuals, teams, and organizations move from a current state to a desired future state. It complements project management: project management coordinates scope, schedule, budget, and deliverables, while the change management process addresses the people side of the transition. This includes understanding concerns, addressing barriers, and supporting the adoption and sustained use of new processes, spaces, and organizational arrangements. 1.5.1 Application to the Strategic Predesign Process In strategic predesign, change management begins during Strategic Planning and continues through Real Estate and Project Definition. It is not an activity added after the plan is complete. Early engagement helps stakeholders discover needs, test assumptions, resolve differences, and establish requirements that people understand and can put into practice. Applying change management to strategic predesign involves several key dimensions: 1. Moving from Ambiguity to Shared Understanding: In predesign, stakeholders may interpret the same goals differently or hold conflicting views of what a facility or organization needs to achieve. This ambiguity of meaning, sometimes called equivocality, must be addressed before requirements can be agreed. Structured stakeholder engagement, visioning workshops, and scenario testing make assumptions and concerns visible. Repeated cycles of testing alternatives and reviewing evidence help participants develop a shared understanding before capital is committed. 2. Testing Apparent Agreement: The Abilene paradox describes a group choosing a course of action its members privately oppose because each mistakenly believes the others support it. In predesign, apparent agreement about space reductions, open-plan layouts, or operating models may conceal concerns that have not been expressed. Change management supports candid participation through structured discussions, anonymous feedback where appropriate, and repeated opportunities to review proposals. These practices help users raise operational constraints and exceptions early. They reduce the risk that silence will be mistaken for agreement or that unresolved objections will delay design and construction; they do not guarantee consensus. 3. Matching Coordination to Information Needs: As uncertainty and task complexity increases, reporting lines alone may not provide enough capacity to exchange information and resolve issues. Change management supports the governance framework by clarifying how decisions are communicated, how cross-functional teams work together, and how participants contribute within their roles. Clear objectives, information channels, and escalation routes help teams respond to new findings. Communication arrangements do not, by themselves, delegate decision authority or permit departure from approved requirements. 4. Learning from Experience and Recording Agreements: Without accessible records of past decisions and outcomes, an organization may repeat spatial or organizational problems. Reviewing how previous facilities and operating arrangements performed helps stakeholders interpret experience and establish evidence-based criteria. This retrospective sensemaking informs, rather than substitutes for, current requirements analysis. Record the resulting agreements and their rationale in the Program of Requirements (POR) and supporting records. Once approved, these documents provide a controlled baseline for subsequent phases. 1.5.2 Change Management Communication Plan A change management communication plan defines what information will be shared, who needs it, who will communicate it, when it will be delivered, and which channels will be used. It also establishes how stakeholders can ask questions and provide feedback throughout the transition. The plan complements project updates rather than replacing them. The project manager coordinates delivery information; change-management practitioners, workplace consultants, HR, and Communications develop engagement messages within their assigned roles. Sponsors and managers communicate the reasons for change and its implications for affected teams. Together, these communications explain what is changing, address concerns, and support informed participation and adoption. The elements of the Communication Plan include:
1.5.3 Putting the Plan into Practice In strategic predesign, these elements put the four change-management dimensions into practice: they organize information exchange, test apparent agreement, establish shared meaning, and communicate the approved baseline. 1. Organizing Information Exchange: Complex tasks generate questions and exceptions that require more than top-down announcements. Use cross-functional workshops and user-group meetings to gather information from those closest to the work. Define regular opportunities for users to explain workflows, constraints, and exceptions. Route recommendations to the designated decision maker under the chapter’s governance and RAPID arrangements; participation does not confer approval authority. 2. Checking Support Before Decisions: During visioning and option reviews, apparent agreement about space reductions, layouts, or workflows may leave operational concerns unresolved. Check understanding and support rather than treating a lack of objections as consensus. Use anonymous surveys where appropriate, structured breakout discussions, and repeated scenario reviews to test assumptions before announcing final decisions. Record operational constraints, differences of opinion, and how they were addressed. The aim is informed participation and transparent resolution, not an assumption that every stakeholder must prefer the selected option. 3. Establishing Shared Meaning: Terms such as “flexibility,” “collaboration,” and “efficiency” may mean different things to different departments. Service providers may also interpret them differently if the organization’s culture and operating practices are not explained. Share relevant case studies and review how past facilities performed under operating demands. Architectural programmers and workplace consultants then translate strategic goals and operating and architectural concepts into concrete functional requirements. This combination of experience review and requirements analysis establishes a shared vocabulary before design begins. 4. Communicating and Maintaining the Approved Baseline: Once requirements are reconciled and approved, publish and reinforce the Program of Requirements (POR) and supporting criteria. Use POR consistently for the program in this chapter. An Owner’s Project Requirements (OPR) document, used in commissioning to record owner expectations and performance requirements, is related but is not the same document by default. Communicate the approved requirements and their rationale to the organization and the design and construction teams. The POR defines the problem before design develops the solution; it records requirements and decisions for agreement, approval, and subsequent use. Communication builds understanding, while formal change control governs revisions. The project manager records proposed changes to scope, site, budget, and schedule, coordinates impact assessments, and routes requests to the designated approval authority. The project manager approves changes only within expressly delegated limits and updates the controlled baseline after authorization. 1.6 Process Improvement Process improvement is the systematic evaluation and refinement of operational workflows to reduce waste and cycle time, improve quality, and align work with organizational goals. Rather than focusing only on an individual asset or project outcome, it examines the system of work: how decisions are made, how responsibilities pass between departments, and how information moves through the organization. Applied to corporate real estate and strategic predesign, process improvement strengthens how organizations assess portfolio needs, gather and validate requirements, and translate enterprise strategy into physical-space delivery. It complements change management: change management supports adoption, while process improvement refines the workflows through which the work is carried out. 1.6.1 Application to the Real Estate Function In corporate real estate, process improvement helps reconcile financial controls, portfolio flexibility, and operational demand by making decision criteria, information needs, and handoffs explicit. Streamlining Portfolio Governance and Decision-Making: Fragmented decisions—for example, business units leasing space independently without enterprise oversight—can weaken portfolio alignment. Consistent phase gates for expansion, consolidation, and acquisition help connect proposed leases and capital commitments to enterprise goals. Each commitment remains subject to the designated approval and signature authorities. Improving Space Utilization and Reducing Waste: Occupancy and utilization of data help identify underused space and opportunities to adjust the portfolio. Evaluate these opportunities against peak demand, functional requirements, and employee experience rather than assuming that unused space is unnecessary or that reductions will preserve productivity. Integrating Service Providers and Delivery: Map the handoffs among architects, contractors, facility managers, and owner-side teams. Clear inputs, deliverables, review responsibilities, and acceptance criteria can reduce avoidable delays and changes while supporting approved cost and schedule targets. Coordination does not replace each party’s contractual or professional responsibilities. 1.6.2 Application to Strategic Predesign In strategic predesign, process improvement makes planning, real estate evaluation, and programming and requirements gathering repeatable without treating every project as identical. Use a consistent method, adapted to the project’s purpose, complexity, and constraints. 1. Standardizing the Transition from Strategy to Space: When projects use inconsistent methods to gather and validate requirements, user needs may be misunderstood and scope may expand without adequate review. A common process supports consistency while retaining project-specific inquiry. Use structured visioning templates, stakeholder interview frameworks, and clear decision gates to translate organizational strategy into functional and spatial criteria. Standardize the method and required evidence, not the answers: requirements still need to reflect each project’s users and operating conditions. 2. Improving Information Flow and Reducing Escalation Bottlenecks: As uncertainty grows, issues that routine procedures do not cover can exceed the capacity of reporting lines alone. Cross-functional user groups and integrated project teams bring relevant information together so operational constraints can be investigated and resolved promptly. Teams act within delegated limits and route decisions beyond those limits through the approved escalation process. Lateral coordination supplements governance; it does not bypass it. 3. Building Structured Feedback Loops: As discussed under Change Management, silence or apparent agreement may conceal unresolved concerns. The Abilene paradox is one form of mistaken agreement, not a universal explanation for stakeholder disagreement. Build repeated cycles of proposal, feedback, and revision into requirements reviews. Test spatial assumptions with stakeholders, document concerns, and provide anonymous input channels where appropriate. These practices support candid participation and help identify operational needs before design; they do not guarantee psychological safety, agreement, or complete requirements. 4. Learning from Experience and Retaining Improvements: Make review and learn part of the process, rather than leaving them to informal recollection. Review how previous facilities and workflows performed under operating demands, identify the causes of observed problems, and test proposed improvements before wider adoption. Use the findings to refine enterprise standards and future project requirements. Record project-specific requirements in the Program of Requirements (POR); maintain related commissioning requirements in the OPR where applicable. Approved baselines change only through authorized change control. 1.6.3 Developing the Internal Delivery Team When an enterprise delivers a major project while establishing and onboarding its delivery team, it must manage two concurrent demands: project delivery and the development of working relationships, procedures, and organizational knowledge. The following framework coordinates these demands. It spans planning through operational transition and complements, rather than replaces, the three predesign phases and their approval gates. Onboarding and capability development continues across stages as project work progresses, culminating in documenting a repeatable process using playbooks. Prepared by Steven Parsahall, with the use of AI agents. © Copyright of the Strategic Predesign Association Stage 1: Strategy, Portfolio, and Team Chartering: Define enterprise intent and delivery responsibilities while planning for team onboarding and the establishment of working procedures. Plan for the time and coordination needed to establish roles, information channels, and shared procedures. Phase-gate reviews should consider both project readiness and the availability of resources to carry out the authorized work. Provide appropriate capacity allowances, such as planned onboarding time, schedule contingency, or specialized external advisers. Managers should base these allowances on identified delivery risks and obtain the required budget and schedule approvals. Explain to stakeholders how onboarding and process development will be coordinated with delivery. Set realistic expectations for reviewing cycles, communication, and decision turnaround times. Stage 2: Predesign, Requirements, and Integrated Onboarding: Use requirements development to clarify the asset’s needs while introducing incoming participants to enterprise goals, operating practices, and project procedures. Include incoming managers and employees in relevant visioning workshops and spatial simulations. Explain the operating context and decision rationale as requirements are developed, so participation also supports onboarding. Make expectations for questions and constructive disagreement explicit. Use structured review cycles and anonymous feedback where appropriate to help surface concerns and operational risks without if apparent agreement represents informed support. Maintain agreed requirements and approved standards in the controlled POR and supporting records. Identify current versions, approval status, and decision rationale so incoming participants can distinguish the authorized baseline from proposals still under review. Stage 3: Co-Development — Project Delivery and Capability Building: Deliver authorized milestones while developing cross-functional coordination and providing mentoring within the workflow. Use clear procedures and performance targets for budget, milestones, and functional and spatial quality. Allow discretion within expressly delegated limits, while retaining mandatory controls, contractual duties, and approved requirements. Process simplification must not become a reason to bypass required reviews. Pair incoming internal managers with experienced consultants or designated senior leads in cross-functional project teams. Use shared work and documented decision reviews to transfer practical knowledge and clarify interfaces between disciplines. When design or construction issues exceed delegated limits or require specialist determinations, escalate them through the approved route. Designated leaders and specialists can support resolution and explain the reasoning while preserving required approvals and professional responsibilities. Stage 4: Operational Transition and Learning: Hand over the asset and retain the process knowledge developed during delivery and onboarding. Support occupant transition and establish clear ongoing responsibilities for facility operations and delivery closeout. Transfer controlled records and agreed routines to the functions responsible for maintaining them. Review both the asset’s performance under operating demands and the delivery processes, focusing on onboarding arrangements, communication channels, and handoffs. Identify process gaps and their causes rather than assessing individual employees. Use the findings to refine enterprise standards, onboarding materials, and delivery procedures. Test and authorize changes before adopting them more broadly so future projects can benefit from both improved asset requirements and better-documented ways of working. A mentoring and cross-functional coordination mechanism can connect onboarding with active delivery. Bring relevant disciplines together to investigate routine issues close to their source, document the reasoning, and escalate decisions that exceed delegated authority. The following cross-functional delivery team arrangement is one proposed way to organize this work. Stage 5: Documented Playbooks: Institutionalize organizational learning, standardize successful workflows, and transition the newly built delivery team from ad-hoc execution to repeatable enterprise operations. Codify tribal knowledge. Translate the practical insights, problem-solving methods, and "double-interacts" developed during project execution and team onboarding into standardized, written playbooks. Integrate the lessons learned from managing task uncertainty and hierarchical exceptions (drawing from Jay Galbraith's Information Processing Model) into updated standard operating procedures. Ensure that future teams do not have to reinvent lateral coordination mechanisms or mentoring pods from scratch. Use the completed playbooks as structured training modules for incoming staff and future project managers, dramatically compressing their learning curve and scaling the organization's information-processing capacity for subsequent initiatives. 1.6.4 Cross-Functional Delivery Team In conclusion, a cross-functional delivery team brings together incoming internal managers or employees and experienced external advisers or designated senior leaders to carry out assigned project work. Team members coordinate across disciplines and develop practical knowledge through mentoring during delivery. The team works within its documented mandate and does not create separate approval authority. 1. Structuring the Teams: Include the roles needed for the assigned work, for example, an internal project manager, an architectural or programming specialist, and an experienced mentor. Define each participant’s responsibilities and the team’s interfaces with the wider project team. Give the team discretion to resolve routine issues only within its documented mandate and approved schedule, requirements, and budget limits. Meeting a target does not itself confer authority to change scope, commit funds, or waive a requirement. Route those decisions to the designated authority. 2. Embedding Mentoring in the Workflow: Combine practical participation with guidance as issues arise. For a design conflict or site constraint, the mentor helps participants define the issue, test assumptions with stakeholders, and compare options. Proposed requirements change remain subject to specialist review and formal approval. Use shared digital tools and co-location where appropriate to make current information and decision rationale accessible. Record key outcomes so onboarding does not depend solely on informal conversations. 3. Escalating Issues Beyond Delegated Limits: Escalate proposed scope changes, cost variances, and other issues beyond the team’s mandate through the approved governance route. The steering committee coordinates review where assigned; the designated decision maker retains approval authority. Use escalations as opportunities to explain options, constraints, and decision rationale with the team lead. Mentoring supports the resolution process but does not delay required decisions or replace formal authorization. Prepared by Steven Parshall, with the use of AI agents. © Copyright of the Strategic Predesign Association |
Feedback on this section
Click on POST to share your thoughts, ideas, comments, and constructive critiques about this section. Tell us what is unclear, what could be improved, and what additional topics we should address.